- Jan 24, 2015
- 561
- 384
2019 details:
I expect something big on the attraction side in 2020, just not a coaster.
I expect something big on the attraction side in 2020, just not a coaster.
If anything it makes me kind of glad that they didn’t. The lift sequence looks like it’s very long. I prefer Infinity Falls’s punchier, shorter lift.Weirdest thing I've seen in a while. Makes me wonder why SeaWorld didn't get something similar.
With Intamin's reputation, I'm not sure I would get on that contraption.It also looks like it has more things to go wrong and cause downtime. Intamin gimmicks like the elevator always seem prone to downtime. SeaWorld has had it's share with their simple version of the elevator, one that rotates just seems like more trouble.
I don’t think this is Intamin. For some reason, I thought this ride was being done mostly in house.With Intamin's reputation, I'm not sure I would get on that contraption.
Oh, even better.I don’t think this is Intamin. For some reason, I thought this ride was being done mostly in house.
Oh, even better.
"Come on down to Jethro's Fix-All Shop. From John Deere to Mercedes-Benz. We fix it all! We also build things. Need a new windmill and well? We got you covered. Be sure to stop in this weekend for our Father's Day Specials! Half off all refurbished chainsaws!"
"Swiss Engineered" sound a good bit better than "Engineered ri'chere in good ol' Branson, MO!"Manufacturer: Design & Construction by
R.E.S appears to be Ride Engineers Switzerland but I couldn't find too much more out about them. So, not "Jethro's Fix-All Shop". It is "Franz's Toboggan and Ice Pick Repairs". Just kidding. They appear to have some interesting designs.
- Silver Dollar City in partnership with R.E.S.
- Barr Engineering