But if they were to add a building, wouldn’t they need to poor a slab first? I get not putting walls up until later, but if there were indoor track, I would think the footers would be on the buildings fondation and not under it.
I imagine a building could have a dirt floor, but I am not sure that is practical. Anyway, I do not think I have ever seen a building go up in FL that wasn’t built on a concrete slab.