There will be breaks. Whether they're there just to slow us down so we don't fly completely off the end, or to stop and hold us, I do not yet know... But if track switches on rides have taught me anything, it's that you need a break stop to make sure the coaster doesn't go until the track switch is 100% complete and verified... So that may be your answer.One thing I have been wondering is whether or not the coaster will be grabbed by brakes or what-not on that steep incline. It would seem fruitless to just glide up and glide right back out. A hold would be super cool.
New aerials from Bioreconstruct!
You missed that? Last month I said we got the direction wrong.Alicia, it appears that you changed your mind from a month ago about the coaster start and coaster end. Your tweet now has it starting on the western side of the building instead of the southern side.
You missed that? Last month I said we got the direction wrong.
That's where we board our flying benches on Forbidden Journey, hence the mirrored walls.They wouldn’t put the Room of Requirement in this ride would they? I mean, it is way out of storyline.
So, I'm curious again about the landing area of the backwards section... it looks to be underground / underwater? Is it a cave, a creature lair, underwater, a hole in the ground...?
The tall part we go up and then backwards will happen inside a dark tunnel, presumably covered in rockwork.Btw, could the "structure" we climb and from where we come down backwards be... The Whomping Willow? I wouldn't mind that. I know we have it on FJ, but it might be worth the clone.
The tall part we go up and then backwards will happen inside a dark tunnel, presumably covered in rockwork.
That... is the real mystery isn’t it?Gotcha. And the place where we land after going backwards?
That... is the real mystery isn’t it?
I don’t think there were any delays. How do you mean? They only closed Dragon Challenge like 8 months ago and dismantled it, rerouted drainage, gutted a building, installed footers and supports, and laid foundation for a new show building. I’d say this thing is moving right along.This project seemed to have long delays before it finally got started. Anyone know why?
It was the latter. Thanks.I don’t think there were any delays. How do you mean? They only closed Dragon Challenge like 8 months ago and dismantled it, rerouted drainage, gutted a building, installed footers and supports, and laid foundation for a new show building. I’d say this thing is moving right along.
I’m also very excited to see load/unload track in place inside the building too (thanks to bio’s pics!)
Or do you mean cause we heard so far in advance they were planning to close DC for a new ride but it was like 2 years later? I think just like Diagon’s MoM expansion, this was always on the table for a Hogsmeade expansion. It was just a matter of them being ready to pull the trigger. (Maybe they needed to raise enough money from Butterbeer sales before starting.) Probably decided it was more important to retrack Hulk first, for whatever reason, (likely to stay well within Marvel’s contractual requirement to keep the rides and land up to a high standard after Disney took over.)