Yea, the number of seats per train was the only real info I’ve had on that front.
Clearly they’ve done a lot to get capacity up though. Moving load platform, lots of space between unload and load for trains in holding, A/B switch for drop track, limited scene stops, and a massive maintenance building with a lot of tracks.
I don’t know how many trains will be out at once, but it seems like it could certainly be a lot. I’m not usually good at this type of thing, but I suppose I could see 8-10 on the track at once. 1 at unload, 2 in waiting, 2 in load, and the rest split out every 3 scenes apart or so.