No way lol. The stations are so far apart from each other and that would be a maintenance nightmare. I would think they would use the old half of the station as a queue area or something. Well find out soon enough.
most likely theyll do something like twisted timbers. i said this before, but with twisted timbers you still have like 4 or 5 switchbacks to go through before the loading gates.