I sure did...and while it was rough, it was never Mean Streak rough. I actually kinda liked it...especially back when it still had the loop.Did you not ride Son of Beast? Because that made Mean Streak look like a kiddy coaster.
I sure did...and while it was rough, it was never Mean Streak rough. I actually kinda liked it...especially back when it still had the loop.Did you not ride Son of Beast? Because that made Mean Streak look like a kiddy coaster.
It's not a maybe. The structure is fine and will be fine. The only threat to the structure is a strong hurricane or tornado. Full stop.Maybe the structure will do fine, but what if RMC will have to go back and inspect.
Spring? Hopefully February or March. I was expecting some Christmas soft openings if there is high demand. Texas Stingray opened late Fevruary
But not April or May because by then the structure has to be inspected again. Mothballing the ride since August and keeping it that way for 7 months.
The worst possible outcome is the whole wood structure rotting and then the coaster collapsing if there is no thorough inspection? Even with Ice Breaker, it needs to pass inspection or else it is unrideable. I do not want to see the coaster collapse. Or delayed to 2022 if the virus is still worse impacting tourism on all cylinders.
Someone tweeted me that Iron Gwazi has numerous tubular steel supports and the wood is filled of arsenic.
Maybe the structure will do fine, but what if RMC will have to go back and inspect.
Spring? Hopefully February or March. I was expecting some Christmas soft openings if there is high demand. Texas Stingray opened late Fevruary
But not April or May because by then the structure has to be inspected again. Mothballing the ride since August and keeping it that way for 7 months.
The worst possible outcome is the whole wood structure rotting and then the coaster collapsing if there is no thorough inspection? Even with Ice Breaker, it needs to pass inspection or else it is unrideable. I do not want to see the coaster collapse. Or delayed to 2022 if the virus is still worse impacting tourism on all cylinders.
Someone tweeted me that Iron Gwazi has numerous tubular steel supports and the wood is filled of arsenic.
Maybe the structure will do fine, but what if RMC will have to go back and inspect.
With official opening in time for the first round of Spring BreakersI hinted at it earlier, but I'm expecting softs around Valentines Day.
Okay. I just want to make sure Iron Gwazi will be safe.
I hinted at it earlier, but I'm expecting softs around Valentines Day.
With official opening in time for the first round of Spring Breakers
I hinted at it earlier, but I'm expecting softs around Valentines Day.
They've really been planning this for a long time.
If only they could have predicted BlackfishIf they predicted COVID and delaying all the ride expenditures to 2021 then they should get out of the amusement park business and get into futures speculation.
*Potter’s overall effect on the market share of Orlando theme parksIf only they could have predicted Blackfish
You're gonna miss HOSGuess I’m waiting to go back till next spring.
Oh well. HOS is something worth checking out every few years. It’s not like HHN where you can’t miss a year.You're gonna miss HOS