They demoed the old buildings in April 2016 and it would have been an 11 month turnaround to get the ride up and running which they never were going to do.
11 months to build that ride simply wasn't going to happen at the same time they had Fallon, Hulk, VB, Sapphire, and Cabana Bay going on.