Going this weekend and debating which route to take. I've started with Origins in the middle then worked around the backside on down before with success, and obviously starting with Ghost Rider warehouses with mixed results, but I've never ever started with Camp Snoopy (actually that's a semi-lie, I did that back in 2001, but that's so long ago, it doesn't count). Is it really the fastest way to finish everything like everyone claims? My instincts tell me Origins, Grimoire and Room 13 can still build up a hefty line if taking too long to get to them, which is why I always want to knock those out first. The Cinema Slasher line is always all bark and no bite (claims to be 2 hours and is 30 mins at most) and Chilling Chambers never gets that long to begin with. But if I knock out the first 3 in 30-45 minutes (I will have about 7-9 people in tow, so may be difficult), will the build up for Origins, Grimoire and Room 13 already begin at around 8pm? Or have I just been lucky before and Camp Snoopy is truly the only way?
Route 1: Chilling Chambers, Cinema Slasher, Mesmer, Room 13, Grimoire, Origins, Widows, Mary, Eight Fingers Nine, The Zoo
Route 2: Origins, Grimoire, Room 13, Mesmer, Cinema Slasher, Chilling Chambers, Widows, Mary, Eight Fingers Nine, The Zoo.