The Olaf AA is rumored to be amazing.
If they really want to knock our socks off, they'll find a way to have him come apart as in the movie. Just putting that out there.
The Olaf AA is rumored to be amazing.
There are new AAs, want a preview? Ride SDMT.
Maelstrom already hits long lines, what this park needs is additional capacity.
Agreed.There are new AAs, want a preview? Ride SDMT.
Maelstrom already hits long lines, what this park needs is additional capacity.
Agreed.
And now since they're continuing the screwing up of World Showcase with cartoons(Thsnks for starting the trend Mexico!), might as well plop down a Brother Bear river rapids ride in Canada, an omnimover in China telling Mulan's story, and a clone of Ratatoille in France while they're at it.
Don't forget moving the Flying Carpet spinner to Morocco.
Don't forget moving the Flying Carpet spinner to Morocco.
Granted it's sarcasm, but that would be the worst move and would be met with even bigger backlash. Morocco is in Africa, Agrabah is inspired by the Middle East. They can get away with a Meet N Greet there, but not an attraction.
From what i've heard (and i've said this a few times elsewhere), load/unload for the ride will be where the current unload is and the queue/exit will be where the theater at the end of the ride currently is.Do you think because of the pants capacity of this ride in its current state and the obvious surge of guest wanting to ride when it becomes frozen that Disney may use there new patented Omni-Boat-Ride thing-me-jig? Most people seem to be in agreement that they will stick with the layout as it is so how easy would it be to incorporate it into the existing infrastructure? That would at least mean that capacity issues are less!!!!!
Test Track re-do was similar. All of Epcot's rides are indoors, so it's always going to be like that with construction there.I think what's going to be odd about construction this time around is that we won't be able to check for any real updates besides signage and maybe the tiny out cove where the boat comes out. It'll just build up mystery overtime of what is in that building
I think what's going to be odd about construction this time around is that we won't be able to check for any real updates besides signage and maybe the tiny out cove where the boat comes out. It'll just build up mystery overtime of what is in that building
I'm sure Disney will release hundreds of behind the scenes videos detailing every step of the process
Lengthening the ride track will increase the time spent on the ride, but you can't increase hourly rider capacity unless you put more people in each boat, or dispatch boats closer together.It's rumored that the load area for Maelstrom will be scene 1 for Frozen. By having this extra scene, there will be a slightly added capacity, however, it won't be near enough to meet demand.
But if the ride is technically longer that way, couldn't they run more boats at once?Lengthening the ride track will increase the time spent on the ride, but you can't increase hourly rider capacity unless you put more people in each boat, or dispatch boats closer together.