Lots going on up top on the track so they need a conduit and connections which must be in a box yet the area is filled with water. What to do? Put the boxes above the water and run the conduits up the legs to the sensors, switches, lighting etc and put the boxes on the footings. The rest of the conduit runs under the water once they fill it back up. There were plenty of boxes before on the footings.