Yes lots of people do and it requires time and energy and resources which maybe they don't have.
Let's be honest.. snapping a photo on your phone cannot possibly require that much time and energy. Everyone, if not 99% of the adult people that walk around Universal/visit this website probably have a phone, and it probably has a built-in camera. It takes about as much time and energy as posting something on this forum. Why come here to post what you saw when it's just as easy to take a picture and upload it?
I will get a few pics tomorrow.
I believe one of the insiders around here said something recently about trying to get everything open for Transformers opening to have everything open at once. Could be wrong though.Haven't been following but where is the proof of an opening to Springfield in a month?
Haven't been following but where is the proof of an opening to Springfield in a month?
June 20th.
As I said before your going to see some serious "installation" work and the next 4-5 weeks are going to be very fun to watch. June my friend is the target...
I could be wrong, but I don't see the lagoon side opening in a month. It might be possible if they work around the clock, hauling butt... but I don't see it happening.
Restaurant side could open in a month, though. Any word on those recent job openings up for Springfield?
That style of ride is a very very quick install. The most time consuming part is the concrete pad and wiring underneath it. The actual parts just get placed in by a crane, they need 2 days at most. And for all we know they could have assembled it off site and are cycling it to reduce the time needed on site.
As far as the rest of it, that can come together quickly.
That style of ride is a very very quick install. The most time consuming part is the concrete pad and wiring underneath it. The actual parts just get placed in by a crane, they need 2 days at most. And for all we know they could have assembled it off site and are cycling it to reduce the time needed on site.
As far as the rest of it, that can come together quickly.
I see where your coming from. But if they planned it right it should come together easy. I mean a lot of it can be prefab off site. The landscaping can truly be done overnight.