IzzyB
V.I.P. Member
I forgot about the train, but I did say new. Meaning never been in the park, I don't feel a re-skin is very new. So original opened with 1 new ride, diagon opened with two. This is opening with a ride and show. All pretty comparable.Well technically at least two.
Hogsmede opened with two reskinned coasters and FJ.
Diagon opened with two brand new rides: Gringott’s and the Express.
Opening with a ride and a show would be pretty standard to open with two “attractions”.