I'm hearing there is some reasoning behind the extended refurbishment. A lot of technical stuff is being replaced and/or refurbished and some (read: like 2) effects are being repaired after years of them needing it. The technical stuff includes a completely new breaking system, a new ride monitoring system, and all the gates on the ride track are being refurbished plus some other smaller stuff.