- Mar 14, 2012
- 60
- 3
I highly doubt that a Christmas announcement is probable. The area can not just sit there until December without a formal announcement. I think and also hope that we get an announcement sometime sooner.
Will be interesting to see what they have up their sleeves in addition to the CityWalk Boardwalk/Decks coming next year.
The area can not just sit there until December without a formal announcement.
Where's my announcement Universal!
If we're really looking at a 2 year time frame. They really have to do the initial announcement sometime this year. Next year would be the more detailed announcement.
Will be interesting to see what they have up their sleeves in addition to the CityWalk Boardwalk/Decks coming next year.
I think next years plans will include the finished Citywalk project, a small attraction at IOA, and a gutted and new attraction at USF. T23D I'm looking at you and your future in Cybertron And no not the ride, something unique to US Orlando.
The lake wall will not be disturbed. Only wall segments "inland wise" will be constructed.
LOMA requirement will not be required since lake configuration will not be changed with these plans
On sheet S501 the wall height is four and half (4 1/2) feet in height
1) Note 2 on sheet A201 calls for parcial demolition and construction of new wall in 2 areas. Remove crosshatch and notes. 2) Wall height on sheet S201 is 96, but in sheet S501 is 109. 3) Note 2 on sheet S201 calls for parcial demolition of wall. 4) May want to add in the resubmittal the required vertical datum elevation equation to all sheets containing vertical information.
"The plans submitted do not contain enough information to perform plan review. Please resubmit correcting this deficiency."
"Resubmit for further review. Detailed civil drawings missing. Detailed topographic information (in NAVD) missing. Floodplain existing and proposed elevations / contours missing. Existing and proposed pond control elevations missing."
If they will not announce until they are close to opening after busy season .
So if the 24 month speculation is right you will not see an announcement
until September 2013.
Hogsmeade started going vertical in late March 2009 and Facade elements were going up in August if I am not mistaken.
There was a huge crane on site for WW 1 back in April 2008, and much of the pad for Hogwarts had been laid and vert construction had begun. Pads should begin to be laid in old amity by June/July. Not sure what all this 2009 talk is all about.
I only remember the first parts of Hogsmeade going vertical in March of 09. Any time before that they were still in demo for the Enchanted Oak right???
Perhaps... but the discussion here was WW/vert construction. Steel went vertical on Hogwarts in Jan/Feb 08 after laying concrete in 07. The Hogsmeade entrance arch went vertical very early in the game as well... remember it just sat there all red and silver steel for the LONGEST time. I feel confident it was framed up in mid/late 08.
Ohh ok I thought he was specifically asking when Hogsmeade went vertical not the project in general.