- Sep 29, 2015
- 68
- 86
Yes but it is short, barely enough time to dust the placeThere's not even an E.T. refurb announced, is there?
Agreed, its only 3 weeks so I'm thinking some rotating equipment overhauls and routine maintenance that can't be done overnight. I can't imagine anything major in that short a timeframeYes but it is short, barely enough time to dust the place
You might want to read the Nintendo threadRumours are, possible overlay in the near future. Ride has to be down for assessment/building assessed...
When I say near future I mean years away, I can only assume it's Nintendo related and they are in the initial stages of finding out wether the building can be used "as is" or it needs totally demolished. I also understand a certain manufacturer will be in attendance for the inspection, no idea who.
Rumours are, possible overlay in the near future. Ride has to be down for assessment/building assessed...
When I say near future I mean years away, I can only assume it's Nintendo related and they are in the initial stages of finding out wether the building can be used "as is" or it needs totally demolished. I also understand a certain manufacturer will be in attendance for the inspection, no idea who.
The studios park is not appealing to me at all this trip.
Since my last trip Twister, Disaster and ET won't be there. None of them are/were show stoppers but they mixed the day up a bit.
This makes zero sense with how UC has been doing projects. Even an attraction like Fallon where the exterior walls remained about 90% of the building was demo'd.
Ok?
Yeah I agree. There's no way they're going to take a headliner IP like that and literally design within a pre-existing box.This makes zero sense with how UC has been doing projects. Even an attraction like Fallon where the exterior walls remained about 90% of the building was demo'd.
Yes but it is short, barely enough time to dust the place
Rumours are, possible overlay in the near future. Ride has to be down for assessment/building assessed...
When I say near future I mean years away, I can only assume it's Nintendo related and they are in the initial stages of finding out wether the building can be used "as is" or it needs totally demolished. I also understand a certain manufacturer will be in attendance for the inspection, no idea who.